English
  • English
  • VietNam
  • Русский
  • 日本語
  • 繁體中文

News

4 Hours vs. 30 Minutes: The Real Cost of Manual Mold Cleaning

Time: 2026-06-18 09:33:51

Author: Double Easy

Click:

How long does it take to clean the cooling channels in one injection mold? If you are doing it manually, the answer is anywhere from 4 hours to 72 hours—and the mold must be removed from the machine and disassembled .

By contrast, a modern mold channel cleaning machine can complete the job in 30 minutes to 4 hours—without removing the mold from the injection machine . This dramatic time savings translates directly to increased production uptime, reduced labor costs, and consistent product quality.

Manual Cleaning: The Hidden Costs

Manual cleaning typically involves disassembling the mold, using wire brushes, steel rods, electric drills, or chemical solutions to scrape and flush out scale and rust. While the cleaning media themselves may be cheap, the hidden costs are significant:

Mold removal and reinstallation → Takes hours and risks misalignment.

Surface damage → Mechanical tools scratch delicate channel walls, accelerating future scale adhesion .

Incomplete cleaning → Narrow or curved channels are impossible to clean thoroughly by hand.

Chemical risks → Acids and alkalis can corrode the mold base material .

Labor intensity → Skilled technicians spend valuable time on non-productive work.

Automatic Mold Channel Cleaning: How It Works

Yizai's mold channel cleaning machines use a high-speed high-pressure water-air pulse technology . The system:

Injects a mixture of high-pressure water and compressed air into the cooling circuit.

Alternates flow direction (forward and reverse) to dislodge contaminants from both ends .

Creates cavitation bubbles that implode against channel walls, breaking scale into suspended particles .

Flushes the debris out, leaving channels clean and restored.

The entire process is fully automated through PLC control with a user-friendly touchscreen—no special skills required .

Comparison: Manual vs. Automatic Cleaning

Factor Manual Cleaning Yizai Mold Channel Cleaning Machine

Mold Removal Required Yes No (clean on the machine) 

Cleaning Time 4–72 hours 30 min – 4 hours 

Consumables Brushes, chemicals, tools None (uses water + air) 

Surface Damage Risk High None (non-contact pulse cleaning) 

Labor 1–2 skilled technicians 1 operator

Why Choose Guangzhou Yizai Intelligent Technology Co., Ltd.?

Yizai's mold channel cleaning machines are engineered for injection molding, die-casting, and blow-molding facilities that demand reliable, repeatable maintenance results. Our systems feature:

Fully automated cleaning cycles with programmable parameters.

Bidirectional flushing for complete contaminant removal .

Mobile design for easy movement between molding machines.

Low maintenance and long service life.

Since 2017, Yizai has served manufacturers in automotive, appliance, electronics, packaging, and medical device industries. Our Huadu District facility, minutes from Guangzhou Baiyun Airport and the high-speed rail station, enables fast shipping and global service.

Switch from manual to automatic mold channel cleaning and see immediate gains in uptime and part quality.

Guangzhou Yizai Intelligent Technology Co.,Ltd

ADD:  No.6,Fubang Road,Huadu District,Guangzhou,Guangdong,China.

Sales support:  Jandy Yang +86 13826173771 +86 18244995597

E-mail:  yizai@double-easy.com  double.easy88@gmail.com

WEB:  www.double-easy.pro

Follow Us

E-mail: yizai@double-easy.com


© 2025 Double-Easy All rights reserved.

Service Center
Contacts
Sales support
+86 13826173771
Sales support
+86 18244995597
ADD
No.6,Fubang Road,Huadu District,Guangzhou,Guangdong,China.
E-mail
yizai@double-easy.com
E-mail
double.easy88@gmail.com
Service Center
添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了